CALENDAR    |    DIRECTORY    |    STORE
Home >
About Us > Prep 20/20
page tools :

Prep 20/20

"There's something special going on at St. John's." ~ Headmaster Ed Hardiman, Ph.D. 

Construction Update April 26: Site preparation for the new Wellness Center is moving along! After Griffin Hall was taken down in early March and the parking area adjacent to Cronin Memorial Stadium was closed to make way for the new facility, crews from Windover Construction drove pilings along the land adjacent to the Brother Linus, C.F.X. Athletic Commons to support these fields prior to excavating the area where the Wellness Center will be built. The existing bleachers and the press box were removed in order to get started on blasting, which is required before the underground utilities and the foundation are installed. Blasting is needed in the next few weeks due to ledge discovered within the footprint of the building. Fill removed from the site of the Wellness Center will be used in the construction of a new student parking area near Memorial Dining Hall!  Watch this virtual tour of the new center, and check back here for construction updates!

72 Spring Street  |  Danvers, MA 01923  |  978-774-1050
A Xaverian Brothers Sponsored School for young men in grades 6 through 12
email page print page small type large type
powered by finalsite